Facility Management Awards Ireland 2024
The primary objective of the project was to replace the existing wooden deck with a more durable and low-maintenance alternative, such as composite decking.
The primary objective of the project was to replace the existing wooden deck with a more durable and low-maintenance alternative, such as composite decking.
The primary objective of the project was to replace the existing wooden deck with a more durable and low-maintenance alternative, such as composite decking.
Each parcel motel was recycled with our partners United Metals in Limerick and certificates were provided to the client.
Each parcel motel was recycled with our partners United Metals in Limerick and certificates were provided to the client.
The project had to be completed over the course of a week to ensure that the kitchen was fully operational for the following Monday.
The existing bathroom was dated and dark – it required bright colours and all fixtures and fittings to be upgraded.
The existing bathroom was dated and dark – it required bright colours and all fixtures and fittings to be upgraded.
In order to ensure that businesses could remain open, large portions of the works were completed during out of retail hours.
Two 63 AMP ePower EV Car Chargers were installed that can charge up to four cars at any one time.
A solid new steel structure was installed, two aluminium frame sets of swing doors were installed, with a sliding door installed to the side for wheelchair access